INDOT to host hearing regarding SR 2 and Larrison Blvd

INDOT

ST JOSEPH COUNTY, Ind. -- A public hearing is scheduled for the proposed improvements to SR 2 and Larrison Blvd in St. Joseph County on March 30 at 5:30 CT / 6:30 EST at New Prairie High School. Members of the community will be able to view project displays and speak with the projects team. 

The project involves converting the existing two-way stop-controlled intersection to a grade-separated interchange with a design referred to as a diverging diamond. The interchange will include constructing two bridges carrying Larrison Blvd/Strawberry Rd over SR 2, four single-lane interchange ramps, widening Larrison Blvd/Strawberry Rd approaching the interchange, and installing traffic signals north and south of SR 2 to control traffic on Larrison Blvd/Strawberry Rd when crossing over the diverging diamond interchange. SR 2 will remain a four-lane divided highway with two lanes in each direction.

Those not able to attend in person can participate via livestream through the INDOT website.

First Warning Neighborhood Weather

Close